Tietto Minerals Drills Best Abujar Gold Hit to Date

THE DRILL SERGEANT: Tietto Minerals (ASX: TIE) reported project best high‐grade gold results from infill drilling completed at the Abujar‐Gludehi (AG) deposit, part of the company’s Abujar gold project in Côte d’Ivoire, West Africa.

Tietto Minerals’ project best results include:

ZDD895 – Section 14B
25.4 metres at 131.1 grams per tonne gold from 36.6m, including 8m at 393.6g/t gold from 38m, including 3.4m at 917.6g/t gold, including 1.1m at 2,853g/t gold; and
12m at 14.6g/t gold from 50m, including 2m at 84.5g/t gold.

Tietto Minerals explained diamond hole ZDD895 is part of recently completed AG Core infill drilling thathad been designed to convert Abujar AG Indicated Resources (35Mt at 1.5g/t gold for 1.65Moz) to Measured – targeting the first two years of Abujar’s gold producti.

“This fantastic intercept of 1.1 metres at 2,853 grams per tonne gold from our infill drilling program at AG is our best achievement to date,” Tietto Minerals managing director Dr Caigen Wang said in the company’s ASX announcement.

“This bonanza gold intercept is located close to surface in fresh mineralisation and combined with the multiple high‐grade intercepts we have reported from our infill drilling, it is expected these will have a material impact on the first years of open pit mining at Abujar.

“Our exploration team is using these latest results to refine our drill targeting of the high‐grade shoots within the Abujar main shear.

“Results from our drilling continue to demonstrate high grades present in this large system and with more than 70 kilometres of strike at Abujar and achieving 100,000 metres of drilling a year; we think there is great potential to deliver more intersections like these.”

 

 

TO READ THE FULL ANNOUNCEMENT: CLICK HERE

 

 

Email: admin@tietto.com

 

Web: www.tietto.com