Cazaly Resources Reports Copper Assays from Bommie Prospect

THE DRILL SERGEANT: Cazaly Resources (ASX: CAZ) reported analytical results RC resource drilling completed at the company’s Halls Creek copper project in Western Australia.

Cazaly Resources carried out a reverse circulation (RC) resource drilling program at the Bommie porphyry copper prospect in Halls Creek during August 2022 consisting of 19 holes drilled to test the Moses Rock Electromagnetic (EM) conductor and the Bommie system.

Wide copper intercepts were returned as down hole depths, including:

HCRC0067
126 metres at 0.3 per cent coper from 54m to 180m;

HCRC0065
110m at 0.4 per cent coper from surface to 110m; and

HCRC0077
114m at 0.3 per cent coper from 2m to 116m.

“We are pleased to see broad intercepts of copper mineralisation at the Bommie prospect, with over 100 metres of mineralisation extending from surface,” Cazaly Resources managing director Tara French said in the company’s ASX announcement.

“We look forward to receiving the maiden resource estimation next month and are further encouraged by the current mineralisation envelope, which is open to the north and west of existing drilling, indicating further growth potential of this copper deposit.”

 

TO READ THE FULL ANNOUNCEMENT: CLICK HERE

 

Web: www.cazalyresources.com.au